Your ADU idea
Define what you want, understand the basic options, and develop an early cost and timing expectation.
View this StepUnderstand what an ADU is, what may be possible on your property, which local rules matter, and what to expect before you hire anyone.
Check local ADU rulesAn ADU is an additional home on the same property as an existing or proposed primary residence. It can provide space for family, rental income, caregiving, or a more flexible way to use your property. The design, size, location, approval path, and construction work can vary.
Concept diagrams show how each type relates to the main home—not a site plan.
A separate structure from the main house. It usually requires new foundations, utility connections, and full exterior construction.
Connected to the existing home. The connection may affect structure, fire separation, utilities, and how construction reaches the site.
Existing garage space converted into living space. Existing foundations and walls may help, but upgrades can still be substantial.
Existing space within a home converted into an ADU. Access, privacy, fire separation, and utility layout need careful review.
A smaller unit contained within a single-family home. Size, kitchen, bathroom, and owner-occupancy rules may differ from a full ADU.
A more individualized design for a specific site or way of living. More design decisions usually mean more coordination and cost uncertainty.
Different ADU types can have different costs and levels of construction complexity. If you are not sure which approach fits your property, ask an experienced ADU Contractor. Search ADU Contractors
California law creates a statewide framework, while the City or County responsible for the property may have additional standards, procedures, and special-area requirements. Confirm the jurisdiction before relying on a size limit, setback, fee, or permit timeline.
Start with the current state framework, definitions, approval protections, and rules that limit what a local agency can require.
Local agencies explain submittal steps, local standards, fees, utility coordination, and special areas. A mailing address does not always identify the responsible agency.
You do not need to solve every technical question yourself. Start by noticing what is already on the property and what might make construction easier or harder. These conditions can change the design, cost, and schedule.
You do not need to answer everything yourself. An experienced ADU Contractor may need to review the property. Search ADU Contractors
Early numbers are useful when you know what assumptions they include. Look at the whole project—not only the construction price—and leave room for design, permits, utilities, site work, selections, and unknown conditions.
Understand square-foot, lump-sum, and cost-plus pricing. Check allowances, exclusions, design fees, permits, and Owner-purchased items before comparing totals.
Understand ADU pricingSeparate design, permit review, bidding, construction, inspections, and closeout. Ask which dates are estimates and what could delay them.
Understand the timelineEstimate the full investment, potential income or family value, ongoing costs, and a simple payback range. Test more than one scenario.
Explore the ADU ROI calculationSite conditions, utility work, finish level, design, included services, and quote assumptions can make two similar-sized ADUs cost very different amounts.
Review what an ADU bid should includeThese responsibilities can be packaged together or handled separately. There is no single right setup for every Owner. Understand who is responsible, how information moves between people, and what is included in the price.
You may use a standard plan, hire a designer or Architect separately, or choose a Contractor that includes design.
You want more design control or already have plans.
Who coordinates design decisions, revisions, and construction pricing.
The Owner, designer, permit specialist, or Contractor may prepare and manage the permit process.
One person clearly owns submittals and agency responses.
Permit fees, corrections, utility approvals, and services not included.
You take responsibility for hiring and coordinating trades instead of hiring a General Contractor for the full build.
More direct control over hiring, purchasing, and project decisions.
You take on more coordination, paperwork, schedule, payment, and jobsite responsibility.
A licensed General Contractor coordinates the construction, trades, schedule, and day-to-day work.
One primary party is responsible for coordinating the build.
Compare scope, included services, allowances, exclusions, and contract price—not price alone.
Use the route as a map from the first idea through final records. Each Step explains what usually happens, what decisions matter, what you should be clear on, and which Checklist belongs to that stage.
Define what you want, understand the basic options, and develop an early cost and timing expectation.
View this StepIdentify relevant experience, compare bids and scope, and understand the agreement before signing.
View this StepPrepare for the work, keep project and payment records, and communicate clearly during construction.
View this StepComplete the Punch List, final walkthrough, records, approvals, and final payment review.
View this StepProject type is already set to ADU. Search by location to see Contractors with documented work records relevant to ADUs. Review the kind of work, location, license information, and services shown before deciding whom to contact.
Not sure where to start? Talk through your ADU project with us and we’ll help you organize the next step.
Talk to UsShort answers help you identify what matters. Detailed explanations link to the relevant ADU Guide or Step.
The answer depends on the jurisdiction, property, existing buildings, proposed ADU type, and any special-area requirements.
It depends on the design and service model. Some Contractors offer packaged design and permit services; other projects begin with a separately hired Architect.
Separate, shared, and private submeter arrangements can affect cost, utility coordination, and future billing. Confirm the assumption before comparing quotes.
Not automatically. Confirm the counted area, finish level, site work, utilities, design, permits, allowances, and exclusions.
This depends on applicable state requirements, the primary dwelling, the proposed ADU, and local review.
Separate the design, permit, bidding, construction, inspection, and closeout periods. Site and utility work can also affect the schedule.