Walk through the ADU with your Contractor
Set aside time for a walkthrough rather than treating handover as a quick key exchange. Bring the agreed drawings and finish information so you can distinguish incomplete work from a new request.
Try everyday things together: open the windows and doors, operate the installed appliances, run the fixtures, and ask for a demonstration of heating, cooling and other equipment. Have the Contractor explain anything that seems unfinished or does not work as expected. Leave electrical, structural and other technical testing to qualified people.
Photograph an issue close up and from far enough away to show the location. That makes follow-up easier than a message saying “the trim isn’t right.”
Make the remaining work specific
A punch list is a record of incomplete or corrective work near the end of the project. Keep new upgrades separate so a final adjustment does not get confused with fixing the original work.
For each item, agree what will be done, who is responsible and the expected date. Review the updated list after the work, rather than assuming an item is closed because someone visited the site.
Collect final records before final payment
Ask the Contractor which official record confirms the ADU is approved for its intended use and how to obtain your copy. Check the permit record with the responsible agency if anything is unclear. Do not schedule a move-in solely because the finishes are complete.
Keep the approved plans, permit and final status records with the final agreement and payment history. Add equipment details, operating instructions and contact information so you can use the finished home without repeatedly asking the builder for basic information.
| Record | Why it helps |
|---|---|
| Final approval record | Shows the recorded completion or occupancy status applicable to the project. |
| Final contract reconciliation | Explains the remaining amount against the agreement and approved adjustments. |
| Equipment and finish information | Identifies installed products when maintenance or replacement is needed. |
| Agreed follow-up list | Records unresolved work and how it will be completed. |
Make the final bill understandable
Start with the original contract amount. Add approved changes, subtract credits, reconcile allowances, and deduct payments already made. Separate your direct purchases if they were never part of the Contractor’s contract.
If the numbers do not match, ask for the calculation before treating the invoice as agreed. A supplier bill may support an allowance actual cost, but check whether that amount has already been billed elsewhere. Use the contract and qualified advice to resolve disputed amounts.
Close the records as well as the work
Payment records and lien releases serve different purposes. CSLB distinguishes conditional releases, which depend on payment, from unconditional releases. A release from one party does not establish payment to every other potential claimant. Use the appropriate official forms and get advice when the payment chain or an exception is unclear. CSLB: Conditional and unconditional releases
Keep the final archive somewhere you control. Retain the Contractor’s contact details and the written process for reporting a problem after handover. If you plan to rent the ADU, separately confirm the local requirements for that use; construction closeout alone does not answer every rental question.
What you’ll be clear about
- How to carry out the final walkthrough and record a punch list.
- Which final records to collect before issuing the final payment.
- How the final amount connects to approved changes, credits and prior payments.
- Who will address any agreed follow-up work.
ADU closeout checklist
Use these prompts when you talk with your project team. Keep technical findings and official approvals with the people qualified to provide them.
Your checkmarks stay on this page until you leave. Download the blank PDF or print your checked copy to keep it.
Questions about this topic
Can I move in when the ADU looks finished?
Confirm the approval needed for occupancy with the permitting agency. Finished surfaces, utility service and a Contractor’s handover date are not substitutes for that confirmation.
Read more: ADU permits and inspections: what the process meansLink to this answerWhat if some items are still unfinished?
Document them and agree the follow-up. Check the contract and obtain advice before deciding what payment adjustment is appropriate; there is no universal holdback amount stated by this guide.
Read more: ADU final walkthrough, punch list and final paymentLink to this answerSources and review notes
Official references checked on . Inline links identify the source for specific statements.
Prepared for PrepareToBuild.info as an editorial draft, assisted by AI. Not yet reviewed by a licensed construction or legal professional. Practical examples are illustrative, not actual quotes, legal terms or completed projects. Confirm requirements with the responsible agency and get qualified advice about your property, contract or finances.